Hydraulic Gates

Kanadevia has a history of more than 100 years as a manufacturer of floodgates and steel pipes. We deliver a large number of gates (including high-pressure gates for dams and large riverga dams and rivers. Based on this safe and reliable construction of water 토토사이트 위키 facilities, we continue to ceaselessly develop new technology such as large flap gates for tsunami and disaster prevention, efficient management methods for existing equip through renewal (redevelopment) of existing dams and hydraulic iron pipes. Through these developments, Kanadevia aims to contribute to the further sophistication of equipment and safe land construction.
Major products
Gates for dams and rivers
This facility controls the huge amount of water and huge water pressure stored in the dammed lake. In addition to flood control, which is the main purpose of the dam, there are numerous facilities for various types of wa river flow rate, selective water intake equipment for intake of water at an appropriate temperature, and measures against turbid water in the dammed lake.
Tokuyama dam emergency flood discharge (crest radial 토토사이트 위키)

Main spillway in redevelopment project for Amagase Dam

- Main 토토사이트 위키 (radial 토토사이트 위키)
- 3.6 meters wide × 4.9 meters high × 9.0 meters radius
- 2 gates
- Branch pipes
- Inlet 10.3 meters in diameter (1 line)/outlet 3.6 meters wide × 5.0 meters high (2 lines)
- Total length
- 43미터
리버 게이트
This 토토사이트 위키 controls river water, such as estuary weirs that maintain the water level at normal times and then allow river water to flow down quickly in the event of a flood, and gutters and flood river. There are also various other facilities such as locks that allow ships to come and go upstream and downstream of the estuary weir, fishway gates that assist fish in swimming upstream, and retarding basin locks that store river

- Nagashima water 토토사이트 위키 (horizontal roller 토토사이트 위키)
- 14.0 meter wide × 14.6 meters high (2 gates)

- 도톤보리 강 워터 게이트
- Left: Water control 토토사이트 위키 (2-stage roller 토토사이트 위키)12.5 meters wide × 6.8 meters high (1 토토사이트 위키)
- Right: Downstream lock (submerge radial 토토사이트 위키)9.0 meters wide × 7.1 meter radius (1 토토사이트 위키)
Penstock
A penstock transports water from a reservoir, etc., in a high location to a hydroelectric power plant in a low location. Since the water must drop all at once in order to generate power, the interior of the penstock is exposed to high press steep slopes, a penstock fulfills an important role for hydroelectric power generation.

- Ojiya power station, No. 3 penstock
- Design water head of 74 미터
- Extension of 78 미터
- Inner diameter 3,350 to 4,500 millimeters

- The penstock of Higashiyokoyama hydropower station
- Design water head of 119 meters
- Extension of 62 meters × 4 pipes
- Inner diameter of 1,200 to 1,500 millimeters
Temporary closing facility for dam renewal construction
Dam renewal work is performed while the dam is operating at a high water level. Therefore, a temporary steel lid known as a "temporary closing facility" is installed on the upstream surface of the dam body to premed the downstream side when drilling holes in the dam body. 토토사이트 위키 is experienced in constructing a large number of temporary closing facilities. Based on that know-how, we have developed a floating temporary closing method.
- *The floating temporary closing method is a joint patent of the Kyushu Regional Development Bureau, the Japan Dam Engineering Center, Kajima Corporation, and 토토사이트 위키.

- Tsuruta dam upstream temporary closing facility
- For additional spillway facilities: Inner area 11.0 meters wide × 4.0 meters deep × 38.0 meters high
- For power generation and water intake: Inner area 13.0 meters wide × 3.7 meters deep × 30.5 meters high
- Floating temporary closing: Inner area 11.0 meters wide × 4.0 meters deep × 25.5 meters high
Shinemon: Hydraulic 토토사이트 위키 Operating Status Management/Diagnostic System

Data during normal operation is automatically collected and statistically processed by software to provide a highly-reliable deterioration index. The system can also be used to investigate the cause of problems.
- Collected data
- Current value, facilities voltage, aperture, rope loosening time,rope tension
- Deterioration index
- Starting current, operating current, number of operations, operating time, start-up time, number of rope bends, rope tension, mechanical efficiency, pulley efficiency
Main Achievements
| 1975 | First visitor 토토사이트 위키 in Japan (Aji-River Hydraulic 토토사이트 위키-Osaka Prefecture) |
|---|---|
| 1983 | First stainless steel shell-type fixed wheel 토토사이트 위키 in Japan (Ozayahimon Central Hydraulic 토토사이트 위키-Kumamoto Prefecture |
| 1986 | First internal elevator facility for a dam in Japan (Tase Dam-Tohoku Regional Bureau) |
| 1987 | The world's first large-sized sediment-flushing facility, upstream on the Kurobe River, built on a JV with Mitsubishi Heavy Industries, Ltd. (Dashidaira Dam Sediment Flushing Facility-KansaiElectr |
| 1988 | First stainless steel multistep straight fixed-wheel 토토사이트 위키 in Japan (Tamagawa Dam Water Intake Facility-Tohoku Regional Bureau) |
| 1989 | First temporary closing facility for dam redevelopment construction in Japan (Yoroibata Dam Temporary Closing Facility-Tohoku Regional Bureau) |
| 1994 | Japan's largest high-pressure-type radial 토토사이트 위키, planned water depth: 115.288 m (Miyagase Dam Main Discharge Facility-Kanto Regional Bureau) |
| 2004 | Japan's largest jet flow 토토사이트 위키, planned diameter: 2,800 mm (Surikamigawa Dam Main Discharge Facility-Tohoku Regional Bureau) |
| 2009 | Japan's largest high-pressure slide 토토사이트 위키 (Obara Dam Flood Control Discharge Facility-Chugoku Regional Bureau) |
| 2015 | Japan's first floating temporary closing facility (Construction of Tsuruta Dam Upstream Temporary Closing Facility-Kyushu Regional Bureau) |
Related technology
Click here for inquiries about 토토사이트 위키 technology


